Part Number: 700MOBHSC60BRZ / Vendor ID #: 75
Pre-Bent S Curve MonoRail
by Visual Comfort & Co. Architectural Collection
$325.00
Availability
  • Manufacturer availability unavailable.
Dimensions
Height: 0.60"
Width: 0.30"
Finish: Antique Bronze
Item Color 1: Brown
Master Color: Brown
Product Overview
BROWN MO HORIZ. S-CURVE ANT.B
Standard Information
Category:
Track Ltg.
Subcategory:
Track Accessories
Finish:
Bronze
Style:
Contemporary
Option:
Title 20
Refinement Options
Category:
Monorail Hardware
Finish:
Antique Bronze
Style:
Contemporary | Modern
Option:
Dry Rated
Bulb Dimmable:
False
Introduction Date:
01/01/2005
Ship Carton Height:
6.00
Ship Weight:
3
Special Features:
From the brand formerly known as Tech Lighting
Vendor Ship Method:
UPS Fedex
Warranty:
1 Year
Weight:
1.10
24 Volt:
False
Adjustable Head:
False
Cable Field Cuttable:
True
Cannot Ship To California:
False
Cannot Ship To Canada:
False
Damp Rated:
False
Dark Sky:
False
Dry Rated:
False
FWC Compliant:
False
Integrated LED:
False
Item Color 1:
Brown
Master Color:
Brown
Motion Sensor Included:
False
Photocell Included:
False
Replaceable Lamp:
False
Reversible:
False
Safety Rating:
ETL
Shape:
Pre-bent S-curve
Sloped Ceiling Compatible:
False
Solar Powered:
False
SORAA:
False
Stocking Type:
Made to Order
System:
MonoRail
Title 20:
False
Title 24:
False
Transformer Required:
False
Warm Color Dimming:
FALSE
WET IP65:
False
Wet Rated:
False
Manufacturer Info
Manufactured By:
Visual Comfort & Co. Architectural Collection
To: From: Subject:
Similar Products View all
Matched by:

Wilkinson's House of Lighting

Wilkinson's House of Lighting was founded in St. George, Utah in 1945 by Kay W. Wilkinson, starting as a small electrical contractor and a provider of electrical appliances and lighting fixtures. Since then, Wilkinson's House of Lighting has emerged to become one of the most respected electrical contractors in the Western United States.

Contact Us

88 East 1160 South
St George, UT 84770

Store Hours

M-F: 9am – 5pm
Sat: 10am- 3pm
Sun: Closed
Copyright 2024 Wilkinson's House of Lighting. All Rights Reserved.